{"id":51656,"date":"2018-10-12T15:34:43","date_gmt":"2018-10-12T14:34:43","guid":{"rendered":"https:\/\/arewa.ng\/?p=51656"},"modified":"2018-10-12T15:37:18","modified_gmt":"2018-10-12T14:37:18","slug":"presidency-replies-atiku-lists-buharis-ongoing-completed-projects-across-36-states","status":"publish","type":"post","link":"https:\/\/arewa.ng\/?p=51656","title":{"rendered":"Presidency replies Atiku, lists Buhari&#8217;s ongoing\/completed projects across 36 states"},"content":{"rendered":"<p><img decoding=\"async\" src=\"http:\/\/arewa.ng\/wp-content\/uploads\/2018\/08\/Buhari-at-the-villa.jpg\"><\/p>\n<div id=\"mvp-content-main\">In what appears like a response to the 14 posers raised by the Atiku Presidential Campaign Organisation,  the Personal Assistant to President Muhammadu Buhari on New Media, Bashir Ahmad, has published a list of ongoing and completed projects across the country by the Buhari administration.<\/p>\n<p>The Atiku Presidential Campaign Organisation had accused Buhari and the All Progressives Congress (APC) of abandoning their duties to hurling insults at the former vice-president Atiku Abubakar, who is the presidential candidate of the Peoples Democratic Party (PDP) in the 2019 presidential elections.<\/p>\n<p>The organization then challenged the government and the APC to name one project started and completed by Buhari administration.<\/p>\n<p>In view of the above challenge, the Presidency has now listed all the ongoing and completed projects done by President Buhari across all 36 states in the country.<\/p>\n<p>FULL TEXT<\/p>\n<p>Ongoing\/Completed Projects By The Buhari Administartion Across 36 States<\/p>\n<p>Abia State<br \/>\nRehabilitation of Enugu-Port Harcourt Road Section 1, Umuahia-Aba Township Rail\/Road bridge crossing.<br \/>\nAmaudo (Ntalakwu-Bende) Flood &amp; Erosion Control Project<br \/>\nCassava processing Plant<br \/>\nRehabilitation and Reconstruction of Enugu-Port-Harcourt dual carriage way Section 1, Lokpanta-Umuahia Tower, Abia.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along umuahia- Bende \u2013 Ohafia Road<\/p>\n<p>Adamawa State<br \/>\nReconstruction off Yola Mubi Bridge at Kaa\u2019aShiwa and Mile 30- Kwambla Road<br \/>\nRehabilitation of Gombe-Numan-Yola road, phase 1,<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ngurore Mayobelwa road<\/p>\n<p>Akwa Ibom State<br \/>\nConstruction of Ididiep-Ekpeyong 10.125km asphalt pavement.<br \/>\nUniversity of Uyo Erosion and Flood Control Project<br \/>\nIkotEbok\/ Mobil Pegasus School Flood and Erosion Control Project<br \/>\nIkot-Ekpene Transmission sub-station<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ete-Abak road<\/p>\n<p>Anambra State<br \/>\nNanka Recent Landslide Project, Phase 1<br \/>\nRemediation Works on Nanka\/Oko Gully Erosion Control.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Nnewi \u2013 Ekwulobia \u2013 Umunze \u2013 Ibinta Road<\/p>\n<p>Bayelsa State<br \/>\nConstruction of Ogbia Nembe 25km road.<br \/>\nSagbama Erosion Rehabilitation Works<br \/>\nCassava processing Plant<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Mbiama \u2013 Yenagoa Road<\/p>\n<p>Bauchi State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Bauchi \u2013 Gombe Road<br \/>\nRehabilitation of Boto Dam, Tafawa Balewa LGA, Bauchi State<br \/>\nConstruction of Road in Boto Town, Tafawa Balewa LGA, Bauchi State<\/p>\n<p>Benue State<br \/>\nConstruction of Loko-Oweto Bridge over River Benue in Nasarawa and Benue States.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Makurdi \u2013 Nasarawa State Border Road<br \/>\nRehabilitation of 120 Poles Solar Street Lights on Katsina-Ala Bridge<br \/>\nRehabilitation of Street Lights on Makurdi Bridge at Makurdi<\/p>\n<p>Cross River State<br \/>\nDualisation of Odukpani \u2013 Itu \u2013 Ikot Ekpene Road in Cross River 9.7 Km\/ Akwa Ibom State with a spur to Ididep 12.2 Km.<br \/>\nGully Erosion Control Project at Eastern Naval Command Headquarters<br \/>\nRehabilitation of Aleshi-Ugep Road, Iyamoyun-UgepSectionin Cross River State.<br \/>\nCassava processing Plant<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Calabar \u2013 Oban \u2013 Ekang Road<\/p>\n<p>Delta State<br \/>\nCompletion of the Itakpe \u2013 Ajaokuta \u2013 Warri (Aladja Jetty) Railway Line and from Aladja to Warri town Port, Refinery and from Itakpe to Abuja.<br \/>\nEstablishment of Pilot Briquetting Plant<br \/>\nConstruction of 23.6km Asphalt Gbaregolor Ogulagha road with 2 bridges measuring 651m.<br \/>\nConstruction of Tebu-Gbokoda pavement road network for the Olero Creek indigenes covering about 6 communities.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Amukpe \u2013 Eku \u2013 Abraka \u2013 Umutu \u2013 Agbo (Edo State Border)<\/p>\n<p>Ebonyi State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Afikpo \u2013 Okigwe Road<\/p>\n<p>Edo State<br \/>\nAuchi Poly-Ekperi-Uzea-Ohe with a spur to Fugar-Afuda-Usugbenun road Section 1 and a pedestrian bridge at Auchi poly gate.<br \/>\nConstruction of Ekpoma-Uhiele 31.1 km road in Esan West.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Benin \u2013 Auchi \u2013 Okene Road<br \/>\nConstruction of 46.5km Udo Ofunama asphaltic concrete road-7.3m wide.<br \/>\nAzura 450MW Independent Power Project<br \/>\nProvision of Street Lights at Benin \u2013 Sapele Interchange along Benin \u2013 Sapele Road<\/p>\n<p>Ekiti State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ado \u2013 Igede \u2013 Itawure \u2013 Osun State Border Road<\/p>\n<p>Enugu State<br \/>\nRehabilitation of Enugu\u2013Onitsha dual carriageway.<br \/>\nObinagu\/Akpulu\/ EnuguezeUmunneobagu Soil Erosion And Flood Control Project<br \/>\nSoil Erosion, Flood Control and Road Improvement Works at Federal College of Education, Eha-Amufu<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Nsukka \u2013 Adani \u2013 Anambra State Border Road<\/p>\n<p>Federal Capital Territory, Abuja<br \/>\nMurtala Muhammad and Umar Musa Yar\u2019Adua express ways<br \/>\nThe Circle Road that envelopes the Central Business District.<br \/>\nThe Nyanya-Gbagalape road<br \/>\nThe Abuja Rail Mass Transit system. The total length of the rail double track laid is 45.245 kilometres<br \/>\nICT innovation Hub<br \/>\n2MW solar power plant<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along kaduna road.<br \/>\nProvision of Street Lights at Giri interchange along Abuja \u2013 Lokoja Expressway<br \/>\nProvision of Street Lights at Kakao, Old Toll Gate along Abuja \u2013 Kaduna Road<br \/>\nAbuja \u2013 Kaduna Standard Gauge Railway<\/p>\n<p>Imo State<br \/>\nConstruction and Dualization of Port Harcourt\/Owerri Road Junction.<br \/>\nRehabilitation of Washed Away Internal Road and Rebuilding of Nwaorie Bridge at AlvanIkoku College of Education<br \/>\nConstruction of Isinweke Oriaha, Uboma Road: a 16km road awarded in 2012, and picked by the Buhari-led administration.<br \/>\nUmuoki-Umuowasi Erosion Control and Road Improvement Works.<br \/>\nCassava processing Plant<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ihiala \u2013 Umuduru Road interchange at EzeudoAmaokpa and Zimuzo Roads<\/p>\n<p>Jigawa State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kano State Border \u2013 Garki \u2013 Gukel \u2013 M\/Madori \u2013 Hadejia Road<\/p>\n<p>Kaduna State<br \/>\n215MW Dual-Fired Plant in Kudenda<br \/>\nRehabilitation of Ilorin-Jebba-Mokwa-Birnin-Gwari-Kaduna Road Section 1<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Zaria \u2013 Pambegua<\/p>\n<p>Katsina State<br \/>\nDaura Township Erosion Control, Phase 1<br \/>\nDaura Township Erosion and Flood Control Project, Phase II<br \/>\nKatsina Wind Farm which has an installed capacity of 10.175MW<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Katsina \u2013 Batsari \u2013 Safana Road<br \/>\nConstruction of Daura Township Roads<\/p>\n<p>Kebbi State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kalgo \u2013 Bunza \u2013 Kamba \u2013 Peka Road<\/p>\n<p>Kogi State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Okene \u2013 Ibillo Road<br \/>\nNigeria<br \/>\nRemediation of Lead Contaminated Sites in Shikira, Rafi Local Government Area<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kontagora \u2013 Tegina Road<br \/>\nRehabilitation of 120 Poles Solar Street Lights on Jebba Bridge, Jebba<\/p>\n<p>Lagos State<br \/>\nThe construction work on the Lagos \u2013 Ibadan Railway Standard Guage Rail line with extension to the Lagos Port Complex at Apapa, Lagos.<br \/>\nLagos Shoreline Protection\/ Rehabilitation Works<br \/>\nGully Erosion Works at Magodo, Lagos State<br \/>\nOghere Ahmed Erosion Control Works<br \/>\nEstablishment of Pilot Lagos State Briquetting Plant<br \/>\nICT innovation Hub<br \/>\nRehabilitation, Reconstruction and Expansion of Lagos-Ibadan dual carriage way, Section 1, Lagos-Sagamu.<br \/>\nRehabilitation, Reconstruction and Expansion of Lagos-Ibadan dual carriage way.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along 3rd Mainland Bridge (Oworo Toll Gate)<br \/>\nconstruction of 60-room Hostel block for Artisans and Craftsmen at Onikan.<\/p>\n<p>Ogun State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Abeokuta \u2013 Sango Ota Dual Carriageway<\/p>\n<p>Plateau State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gimi Road<\/p>\n<p>Rivers State<br \/>\nRehabilitation and reconstruction of the moribund Rail system in the Port Harcourt port.<br \/>\nConstruction of KAA-ATABA Road and Bridges: Originally awarded in 2012, Kaa-Ataba road connecting to Andoni\/Opobo LGA was picked up by President Muhammad Buhari\u2019s administration.<br \/>\nDredging and Reclamation of 600 Hectares of swampy land with 60 million cubic meters of sand at the Onne Port, Port Harcourt, Rivers State, to enable port expansion at the Ocean terminal.<br \/>\nThe Ogoni Land Clean-up and remediation project<br \/>\nCassava processing Plant<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ahoada \u2013 Okoku \u2013 Okwuzi Road<\/p>\n<p>Taraba State<br \/>\nThe Kashimbilla Hydropower plant<br \/>\n3050MW Mambilla Hydro Power Plant<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Jalingo \u2013 MutumBiyu \u2013 Wukari Road<\/p>\n<p>Nasarawa State<br \/>\nCompleted the Inner Southern Expressway (ISEX), which is the expressway providing rapid East-West movement to the southern flank of the city linking the Abuja-Keffi road<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Lafia \u2013 Makurdi Road<\/p>\n<p>Kwara State<br \/>\nRehabilitation of Ilorin-Jebba-Mokwa-Birnin-Gwari-Kaduna Road Section 1.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ilorin \u2013 Ganmo \u2013 AjaseIpo, Road<br \/>\nInstallation\/Rehabilitation of Street Lights on Ilorin-Ibadan Expressway Geri Alimi) Spur, Ilorin<br \/>\nRehabilitation of Street Lights on Ogbomosho \u2013Ilorin road, Spure Geri Alimi by (Eyienkorin) Ilorin<\/p>\n<p>Oyo State<br \/>\nDualisation of Oyo-Ogbomosho-Ilorin Oyo-Ogbomosho-Ilorin, Section II (OyoOgbomosho).<br \/>\nKudeti Flood Control Works<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ogbomosho \u2013 Dogo \u2013 Igbetti Road<br \/>\nConstruction and rehabilitation of Iseyin \u2013 Okeho<br \/>\nProvision of Street Lights at Ogbomosho Interchange along Ibadan \u2013 Ogbomosho \u2013 Ilorin Expressway, (Phase II) Ogbomosho<\/p>\n<p>Ondo State<br \/>\nCassava processing Plant<br \/>\nConstruction of 13KV transmission line and 132\/33KV Substation at Okitipupa, Ondo.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ore \u2013 Okitipupa Road<\/p>\n<p>Osun State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ibadan \u2013 Ife Dual Carriageway<br \/>\nConstruction and rehabilitation of Elentere Apipontoro Road<br \/>\nGombe State<\/p>\n<p>Rehabilitation of Gombe-Numan-Yola road, phase 1.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gombe \u2013 Dukku \u2013 Darazo Road<\/p>\n<p>Kano State<br \/>\nDualisation of Kano-Maiduguri road section iv, (Potiskum-Damaturu)<br \/>\nDualisation of Kano-Katsina Road phase 1.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along KwanarDumawa \u2013 KunyaBarubaJigawa State Border Road<br \/>\nConstruction and Rehabilitation of Saminaka \u2013 Doguwa<br \/>\nConstruction and Rehabilitation of Doguwa \u2013 Tiga<br \/>\nThe execution of Kano \u2013 Kaduna Rail line<br \/>\nLagos \u2013 Kano Railway Modernization Project<\/p>\n<p>Sokoto State<br \/>\nRehabilitation of Sokoto-Tambuwal-Jega road-Kotangora\/makera road in sokoto\/Kebbi\/Niger States.<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kajiji \u2013 Jabo \u2013 Zamfara State Border<\/p>\n<p>Yobe State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Damaturu \u2013 Dapchi \u2013 Bayamari Road<\/p>\n<p>Zamfara State<br \/>\nPatching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gusau \u2013 TalataMarafa \u2013 Sokoto State Border Road\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>In what appears like a response to the 14 posers raised by the Atiku Presidential Campaign Organisation, the Personal Assistant to President Muhammadu Buhari on New Media, Bashir Ahmad, has published a list of ongoing and completed projects across the country by the Buhari administration. The Atiku Presidential Campaign Organisation had accused Buhari and the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38954,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[4],"tags":[1412],"class_list":["post-51656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-politics","tag-nigerian-politics"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/arewa.ng\/index.php?rest_route=\/wp\/v2\/posts\/51656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arewa.ng\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arewa.ng\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arewa.ng\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/arewa.ng\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=51656"}],"version-history":[{"count":0,"href":"https:\/\/arewa.ng\/index.php?rest_route=\/wp\/v2\/posts\/51656\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arewa.ng\/index.php?rest_route=\/wp\/v2\/media\/38954"}],"wp:attachment":[{"href":"https:\/\/arewa.ng\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=51656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arewa.ng\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=51656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arewa.ng\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=51656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}